|
|
TM 9-1375-213-12-1
d. Ensure that firing plug is
b . Remove the demolition circuit from
attached to the firing cable connector.
the subpack and from the plastic packing
e . Connect firing circuit to field
bag and place the plastic bag over rocket
f i r i n g lead as follows:
n o z z l e . Tape securely around narrow
section of nozzle to provide moisture and
WARNING
d u s t protection. This is most important
if you are going to leave the kit set up
Before connecting firing
for some time.
c i r c u i t to field firing lead,
Ensure that the continuity plug
operator in charge must assure
( f i g . 1-5) is threaded onto the interkit
that all other personnel are
at least 500 feet (150 meters)
connector.
If continuity plug is
from nearest kit and under cover
missing, short the two pins in interkit
connector with a piece of wire.
or at least 4000 feet away
(1200 meters) if no overhead
c o v e r is available.
2.8.1(2.8.2 blank)
Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |