Click here to make tpub.com your Home Page

Page Title: Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities (AMCCOM)-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1300-277
Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities (AMCCOM)-Continued
ANNISTON ARMY DEPOT- Continued
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Bldg 600-11,059 sq
ft.
Substantial dividing
walls.
Overhead hoist ca-
pacity 5,000 lb.
Capability for
downloading CBU
units.
Bldg 168- 10,080 sq
ft.
Substantial dividing
walls.
Power conveyors.
Powder collection
system.
FT. WINGATE ARMY DEPOT ACTIVITY
Bldg 528- 21,644 sq
APE 1300 plant w/o
APE 1236 W/KIT E010
8 detonation sites.
5 burning sites.
ft.
water treatment
Center substantial
system.
Detonation restric-
No burning cage.
dividing wall with
Washout system is
tions; 5,000 lb
operational bays.
of old design.
above ground;
Burning restrictions
Power conveyors.
Requires refurbish-
10,000 lb below
10,000 lb.
APE disassembly and
ing and opera-
ground.
breakdown equip-
tional check out.
ment (pull apart
and depriming
System requires
machines).
water treatment
Powder collection
and charcoal
system.
filter system.
Monorail system.
Change 2 9-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business