Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities (AMCCOM)-Continued
ANNISTON ARMY DEPOT- Continued
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Bldg 600-11,059 sq
ft.
Substantial dividing
walls.
Overhead hoist ca-
pacity 5,000 lb.
Capability for
downloading CBU
units.
Bldg 168- 10,080 sq
ft.
Substantial dividing
walls.
Power conveyors.
Powder collection
system.
FT. WINGATE ARMY DEPOT ACTIVITY
Bldg 528- 21,644 sq
APE 1300 plant w/o
APE 1236 W/KIT E010
8 detonation sites.
5 burning sites.
ft.
water treatment
Center substantial
system.
Detonation restric-
No burning cage.
dividing wall with
Washout system is
tions; 5,000 lb
operational bays.
of old design.
above ground;
Burning restrictions
Power conveyors.
Requires refurbish-
10,000 lb below
10,000 lb.
APE disassembly and
ing and opera-
ground.
breakdown equip-
tional check out.
ment (pull apart
and depriming
System requires
machines).
water treatment
Powder collection
and charcoal
system.
filter system.
Monorail system.
Change 2 9-6
|