|
|
TM 9-1300-277
Table 9-1. DESCOM and AMCCOM Capabilities Summary - Continued
Washout
Detonation
Open burning
Depot
capabilities
capabilities
capabilities
capabilities
PINE BLUFF
CHEMICAL ITEMS ONLY
1
DEACT
FURNACE
NONE
None
W/SCRUBBER
1 CHAIN GRATE FURN W/
SCRUBBER
1 FLUID BED INCINERATOR
W/SCRUBBER
PUEBLO
APE 1300
APE 1236 W/KIT EO10
14 SITES 50 LB ABOVE/
4 SITES
4,000 LB TO 20,000
1 CAGE
LB BELOW
RED RIVER
APE 1300 W/FILTER
2 APE 1236 W/KIT EO10
24 SITES 100 LB ABOVE/
1 SITE HE 50,000 LB
3,000 LB BELOW
1 SITE SMOKELESS
60,000LB.
SAVANNA DA
1 APE 1300 W/O AP
APE 1236W/KIT E010
1 SITE 25 LB ABOVE/
9 SITES UNSAFE,
500 LB BELOW
UNSTABLE ONLY
SENECA AD
NONE
1 APE 1236 W/KIT EO10
8 SITES 50 LB ABOVE
8 SITES 1 CAGE
AND BELOW
WEATHER CONDITION
RESTRICTIONS
SIERRA AD
NONE
1 APE 1236 W/KIT EO10
14 SITES 10,000 LB
2 SITES P&E ITEMS AND
ABOVE
CONTAMINATED WASTE
ONLY
TOOELE AD
APE 1300 W/FILTER
1 APE 1236 W/KIT E010
9 SITES 592 LB ABOVE/
OPEN BURNING SITES
5,000 LB BELOW W/7
AVAILABLE
FEET COVER
1 APE 1236 W/KIT E010
24 SITES 592 LB ABOVE/
10,000 LB BELOW W/
10 FEET COVER
UMATILLA DA
APE 1300 W/O WATER TREAT-
1 APE 1236 W/KIT E010
24 SITES 50 LB ABOVE/
1 SITE
MENT, REQUIRES BOILER
100 LB BELOW W/
SYSTEM
2 FEET COVER
Change 2 9-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |