Page Title: EXPLANATION OF COLUMNS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1290335-34&P
support items for maintenance, repair, or overhaul of
shutdown of production facilities, would prove
end items. Source codes are entered in the first and
uneconomical to reproduce at a later time.
second positions of the Uniform SMR Code format as
follows:
KD
-An item of a depot overhaul/ repair kit and not
purchased separately. Depot kit defined as a kit
Code
Definition
that provides items required at the time of
overhaul or repair.
PA
-Item procured and stocked for anticipated or
known usage
KF
-An item of a maintenance kit and not purchased
separately. Maintenance kit defined as a kit that
PB
-Item procured and stocked for insurance
provides an item that can be replaced at
purpose because essentially dictates that a
organizational  or  intermediate  levels  of
minimum quantity be available in the supply
maintenance.
system.
KB
-Item included in both a depot overhaul/repair kit
PC
-Item procured and stocked and which otherwise
and a maintenance kit.
would be code c PA except that it is deteriorative
in nature.
MO
-Item to be manufactured or fabricated at
organizational level.
PD
-Support item, excluding support equipment,
procured for initial issue or outfitting and stocked
MF
-Item to be manufactured or fabricated at the
only for subsequent or additional' initial issues or
direct support maintenance level.
outfittings.
Not  subject  to  automatic
replenishment.
MH
-Item to be manufactured or fabricated at the
general support maintenance level.
PE
-Support equipment procured and stocked for
initial issue or outfitting to specified maintenance
MD
-Item to be manufactured or fabricated at the
repair activities.
depot maintenance level.
PF
-Support equipment which will not be stocked
AO
-Item to be assembled at organizational level.
but which will be centrally procured on demand.
AF-
Item  to  be  assembled
at
direct
support
PG
-Item procured and stocked to provide for
maintenance level.
sustained support for the life of the equipment. It
is applied to an item peculiar to the equipment
AH-
Item to be assembled at general support
which, because of probable discontinuance or
maintenance level.
C-2