TM 9-1290-335-34&P
CHAPTER 2
CHECKOUT PROCEDURE
2-1. SCOPE
Checkout of the Mechanical Azimuth Indicator is done by using the flow chart procedures in this chapter. You must do the
checkout procedure from the beginning until a fault symptom is found. When it is, go to the fault symptom index in
Chapter 3. After you have corrected the fault, start at the beginning again and do the checkout procedure until the azimuth
indicator is working correctly.
2-2. CHECKOUT (SHEET 1 OF 10)
TEST EQUIPMENT: 0-36 VDC power supply
PERSONNEL: One
REFERENCES: JPG 41C for using power supply
EQUIPMENT CONDITION: Azimuth indicator on work bench
PRELIMINARY PROCEDURES: Do inspection upon receipt (Vol II, para 3-2)
Vol I
Para 2-1
2-1
-
|