Click here to make tpub.com your Home Page

Page Title: EXPLANATION OF COLUMNS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-1290-232-34&P
KD
-An
item
of
a
depot
overhaul/
support
items
for
maintenance,  repair,
Source  codes
repair
kit
and
not
purchased
or  overhaul
of
end  items.
separately.
Depot
kit
defined
are  entered
in
the
first
and
second
as
a
kit
that
provides
items
positions
of
the
Uniform
SMR
Code
format
required
at  the  time
of
as
follows:
overhaul
or  repair.
Definition
Code
KF
-An
item
of
a
maintenance
kit
PA
-Item  procured  and
stocked
and  not  purchased  separately.
for  anticipated  or
known  usage.
Maintenance  kit  defined  as
a
kit
that
provides
an
item
-Item  procured  and  stocked
for
that
can
be
replaced
at
PB
insurance  purpose  because
organizational  or  intermediate
levels  of  maintenance.
essentiality  dictates  that  a
minimum  quantity  be  available
in
the
supply
system.
KB
-Item
included
in
both
a
depot
overhaul/repair  kit
and
a
PC
-Item  procured  and  stocked  and
maintenance  kit.
which  otherwise  would  be  coded
PA  except  that  it  is
MO
-Item
to
be
manufactured
or
deteriorative
in
nature.
fabricated
at
organizational
level.
PD
-Support
item,
excluding
support
equipment,
procured
for
initial
MF
-Item  to  be  manufactured  or
issue  or  outfitting  and
stocked
fabricated  at  the  direct
only  for  subsequent  or
support  maintenance  level.
additional
initial
issues
or
MH
outfittings.  Not  subject
to
-Item  to  be  manufactured  or
fabricated  at  the  general
automatic  replenishment.
support
maintenance
level.
PE
-Support  equipment  procured
MD
and  stocked  for  initial  issue
-Item  to  be  manufactured
or
or  outfitting  to  specified
fabricated  at  the  depot
maintenance  repair  activities.
maintenance
level.
AO
PF
-Support  equipment  which  will
-Item
to
be
assembled
at
not  be  stocked  but  which  will
organizational
level.
be  centrally
procured
on
AF
demand.
-Item
to
be
assembled
at
direct
support
maintenance
level.
PG
-Item  procured  and  stocked  to
provide  for  sustained  support
AH
-Item  to
be  assembled  at  general
for  the  life  of  the  equipment.
support
maintenance  level.
It  is  applied  to  an  item
peculiar
to
the
equipment
-Item
to
be
assembled
at
depot
AD
which,  because  of  probable
maintenance
level.
discontinuance  or  shutdown
of
production
facilities,
would
XA
-Item
is
not
procured
or
stocked
prove  uneconomical
to
reproduce
because  the  requirements  for
at  a  later  time.
the  item  will  result  in  the
D-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business