| ||||||||||
| 
 
  | 
![]() TM 9-1270-219-13&P 
i. 
Static Plumbing Leak Test. 
EPU and Plumbing Pitot Static Leak Test. 
g. 
Connect the pneumatic circuit as shown in 
(1) 
(1) 
Connect 
the 
pneumatic 
circuit 
as 
shown 
in figure 4-8. 
Close the static vent valve on the tester. 
(2) 
Close the vent valve on the tank. 
With the tester static vent open and the 
(3) 
altimeter 
baro-set 
adjusted 
to 
29.92 
in. 
I t is essential that pitot and static lines 
H g . note the tester altimeter reading (approx. 
are teed together as shown to avoid 
airfield 
elevation). 
damage to the EPU. 
Close the static valve on the tester. Reduce 
(4) 
the static pressure at the tester to 10,000 
feet. 
With the tester static vent open and the 
(2) 
altimeter 
baro-set 
adjusted 
to 
29.92 
in. 
(5) 
Observe 
the 
altimeter 
and 
note 
the 
loss 
H g . note the tester altimeter reading (approx. 
of 
altitude 
over 
a 
period 
of 
120 
seconds. 
airfield 
elevation). 
Check on figure 4-10 that the altitude loss 
(6) 
Close the static vent valve on the tester. 
(3) 
is 
acceptable 
at 
the 
appropriate 
airfield 
Reduce the static pressure at the tester 
elevation. 
to 10,000 feet. 
Open the tank vent valve to release the 
(7) 
(4) 
Observe 
the 
altimeter 
and 
note 
the 
loss 
pressure. 
of 
altitude 
over 
a 
period 
of 
120 
seconds. 
D i s c o n n e c t the pneumatic circuit. 
(8) 
Check on figure 4-9 that the altitude loss 
(5) 
is 
acceptable 
at 
the 
appropriate 
airfield 
EPU Pitot Leak Test. 
elevation. 
j. 
(1) 
Connect 
the 
pneumatic 
circuit 
as 
shown 
Open the tank vent valve to release the 
(6) 
in 
pressure. 
(7) 
D i s c o n n e c t the pneumatic circuit. 
(2) Repeat the leak test given in sub-para. h. (3) 
through 
(5). 
h. P i t o t P l u m b i n g L e a k T e s t . 
k. EPU Pitot and Static Leak Test. 
(1) 
D i s c o n n e c t the union nuts on the Pt and Ps 
(1) Connect the pneumatic circuit as shown in 
c o n n e c t o r s at the EPU. Leave the Pt and Ps 
adapters installed in the EPU. 
(2) 
Connect 
the 
pneumatic 
circuit 
as 
shown 
in figure 4-11. 
Close the pitot vent valve on the tester. 
(3) 
C l o s e the vent valve on the tank. Raise the 
It 
is 
essential 
that 
pitot 
static 
lines 
pitot pressure at the tester to 175 knots and 
are 
teed together as shown to avoid 
observe the airspeed indicator. 
damage to the EPU. 
(4) 
O v e r a period of 120 seconds the indication 
shall not fall below 171 knots. 
(2) Repeat the leakage test of sub-para i. (2) 
(5) 
Open the tank vent valve to release the 
through 
(8). 
pressure. 
4-14 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |