|
|
TM 9-1220-231-34&P
4-16.
FIRE CONTROL LEVEL INSTALLATION (CONT)
FRAME 2
Step
Procedure
1.
Check ballistic drive fire control level bubble (1) is centered.
NOTE
If bubble is centered, go to step 4; if not, continue with
step 2.
Using spanner wrench, loosen ring (2) slightly.
2.
Using 3/16" screwdriver, turn eccentric (3) left or right until level vial assembly bubble
3.
(1) is centered.
NOTE
Eccentric (2) may have to be held in position with
3/16" screwdriver to prevent it from turning when
doing next step.
Using spanner wrench, tighten ring (2).
4.
Check level vial assembly bubble (1) remains centered. If not, repeat steps 2 through 5.
5.
Remove gunner's quadrant.
6.
NOTE
FOLLOW-ON MAINTENANCE
Do performance test (Vol I, Chap 2 )
END OF TASK
Para 4-16 Cont
Vol II
4-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |