Click here to make tpub.com your Home Page

Page Title: FIRE CONTROL LEVEL INSTALLATION (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-231-34&P
4-16.
FIRE CONTROL LEVEL INSTALLATION (CONT)
FRAME 2
Step
Procedure
1.
Check ballistic drive fire control level bubble (1) is centered.
NOTE
If bubble is centered, go to step 4; if not, continue with
step 2.
Using spanner wrench, loosen ring (2) slightly.
2.
Using 3/16" screwdriver, turn eccentric (3) left or right until level vial assembly bubble
3.
(1) is centered.
NOTE
Eccentric (2) may have to be held in position with
3/16" screwdriver to prevent it from turning when
doing next step.
Using spanner wrench, tighten ring (2).
4.
Check level vial assembly bubble (1) remains centered. If not, repeat steps 2 through 5.
5.
Remove gunner's quadrant.
6.
NOTE
FOLLOW-ON MAINTENANCE
Do performance test (Vol I, Chap 2 )
END OF TASK
Vol II
4-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business