Click here to make tpub.com your Home Page

Page Title: BALLISTICS DRIVE INSTALLATION (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-231-34&P
4-5.
BALLISTICS DRIVE INSTALLATION (CONT)
FRAME 1
Procedure
Step
1.
Using rags and alcohol, clean mounting pads on turret roof for right and left support
assemblies (1) and (2) (JPG).
2.
Check two pins (3) in left mounting pad are not damaged. If damaged, replace with
good pin(s).
Repairman B, outside turret, carefully hand ballistics drive through loader's hatch to
3.
repairman A inside vehicle.
GO TO FRAME 2
Vol II
4-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business