|
|
TM 9-1220-231-34&P
2-2.
PERFORMANCE TEST (CONT)
Step
Procedure
Maintenance Action
Symptom
1.
Disconnect trunnion link (1) (Vol
II, para 4-4, frame 2, steps 1 thru
3).
2.
Turn cross shaft (2) all the way in
Cross shaft does
Send unit to depot
both directions. Check shaft (2)
not turn smoothly.
for repair.
turns smoothly without binding.
NOTE
Correct remaining faults listed on
DA Form 2404.
Do final inspection (Vol II, para
END OF TASK
Para 2-2 Cont
2-2
Vol I
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |