|
|
TM 9-1220-220-34
4-32.
JUNCTION BOX ASSEMBLY ASSEMBLY (CONT)
FRAME 1
Step
Procedure
1.
Lubricate bearings (1) and (7) before installing (JPG).
2.
Place (small) bearing (I) in junction box assembly (2).
3.
Place gear (3) on shaft (4) with guide holes (5) lined up.
4.
Using hammer, drive pin (6) through guide holes (5).
5.
Place (large) bearing (7) on shaft (4).
6.
Place seal (8) on shaft (4).
7.
Insert shaft assembly (4) in junction box assembly (2).
8.
Using spanner wrench, install retainer (9) in junction box assembly (2). Do not tighten.
GO TO FRAME 2
4-81
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |