Click here to make tpub.com your Home Page

Page Title: Section 6. LINK CONNECTOR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1 220-220-34
Section 6. LINK CONNECTOR
4-15.
LINK CONNECTOR MAINTENANCE PROCEDURES INDEX
Task
Reference (para)
Removal
Disassembly
4-16
Assembly
4-17
Installation
4-16.
LINK CONNECTOR DISASSEMBLY
TOOLS:
.050 allen wrench
.078 allen wrench
2 3/16 pin spanner wrench
PERSONNEL:
One
EQUIPMENT CONDITION:
Link connector on work bench
PRELIMINARY PROCEDURE: Remove link connector (para 4-10, frame 1)
FRAME
Step
Procedure
1.
Unscrew cap screw (1) and remove cap screw (1) and lockwasher (2).
2.
Loosen two setscrews (3), using .050 allen wrench.
3.
Remove flat washer (4), seal (5), and retainer (6) from connector (7) using 2 3/16 pin
spanner wrench.
4.
Press seal (5) and washer (4) out of retainer (6). Discard seal and washer if damaged.
5.
Carefully press out sleeve (8), bearing (9), retainer (10), seal (11), flat washer (12) and
spindle (13).
6.
Tighten setscrews (14) to remove disks (15), using .078 Allen wrench. Discard disks (15)
and remove setscrews (14).
7.
Tighten setscrews (16) to remove disks (17) using .078 Allen wrench. Discard disks (17)
and remove setscrews (16).
8.
Tighten setscrews (3) to remove disks (18), using .050 Allen wrench. Discard disks (18)
and remove setscrews (3).
END OF TASK
Para 4-50 Vol II
4-50

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business