|
|
TM 9-1220-220-34
Section 4. TRUNNION LINK
4-8.
TEMPERATURE COMPENSATING ROD INSTALLATION
TOOLS:
3/4" box end wrench
6" slip joint pliers
PERSONNEL:
One
REFERENCES: JPG 41C for installing cotter pins
EQUIPMENT CONDITION:
Temperature compensating rod and related parts on work bench
FRAME
Step
Procedure
1.
Screw adjuster (1) on rod (2) counterclockwise (left-hand thread) the number of turns
recorded during removal procedure.
2.
Using wrench, tighten capscrew (3).
3.
Place two lugs (4) of bracket (5) over the lug (6) of the rod (2) with machined surface
as shown. Slide pin (7) through lugs (4 and 6).
4.
Place washer (8) on pin (7). Install cotter pin (9) (JPG).
NOTE
FOLLOW-N MAINTENANCE
Install temperature compensating rod and related parts (para 4-5, frame 4).
Do performance test (Vol I, para 2-2).
END OF TASK
PARA 4-8 VOL II
4-42
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |