|
|
TM 9-1220-220-34
4-5.
BALLISTICS DRIVE INSTALLATION (CONT)
FRAME 7
Step
Procedure
1.
Using 7/16" wrench, install clamp assembly (1) (limit stop attached), using one screw
(2) and one lockwasher (3).
2.
Using screwdriver, install bracket (4), switch (5) (attached) using two screws (6) and two
lockwashers (7).
3.
Connect electrical plugs (8) to electrical connectors (9).
NOTE
FOLLOW-ON MAINTENANCE
Install M 13A 1 elevation quadrant (TM 20-2). Install M32 (or M35) gunner's periscope (TM
20-2). Do performance test (Vol I, para 2-2).
END OF TASK
4-38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |