Click here to make tpub.com your Home Page

Page Title: BALLISTICS DRIVE INSTALLATION (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
4-5.
BALLISTICS DRIVE INSTALLATION (CONT)
FRAME 8
Step
Procedure
NOTE
Do steps 1,2, and 3 for M10A3 only.
1.
Turn the superelevation box output shaft (1) fully clockwise, then, turn counterclockwise
to the number of turns marked on qualification plate (2).
2.
Aline mark on output shaft (1) with index mark on qualification plate (2).
3.
Set electronic computer to zero" elevation.
4.
Using 3/16" flat tip screwdriver, install shaft (3) on superelevation box output shaft (1)
with four screws (4) and four lockwashers (5).
5.
Using 3/16" flat tip screwdriver, install shaft (3) on junction box assembly (6) (install
shaft (3) on inner drive shaft of electronic computer for M10A3) with four screws (7)
and four lockwashers (8).
GO TO FRAME 9
Para 4-5 Cont Vol II
4-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business