Click here to make tpub.com your Home Page

Page Title: PERFORMANCE TEST (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
2-2.
PERFORMANCE TEST (CONT)
FRAME 6
Step
Procedure
Symptom
Maintenance Action
1.
Set circuit breaker switch
(1) to ON.
2.
Using right side of binocu-
lars, look through firing
pin hole (6) in breech block
(7). (TM 10)
3.
Look through eyepiece (8)
Boresight and
Set circuit breaker switch
of gunner's periscope (9).
Synchronization error.
to OFF.
Check that gunner's peri-
scope (9) is boresighted
a. Level gun to within plus
(aimed at same target as
.5 minus 1.5 mils and ad-
rangefinder (1)).
just rangefinder link con-
nector assembly (Vol II,
para 4-5, frame 6).
b. Place correct number
of turns on input shaft (Vol
II, para 4-4, frame 4 and
para 4-5, frame 9).
4.
While looking into eyepiece
(5) of rangefinder (1), ele-
vate or depress the gun and
traverse the turret to find
a target 600 meters away
(TM 20-2)
GO TO FRAME 7
Para 2-2 Cont Vol I
2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business