Click here to make tpub.com your Home Page

Page Title: PERFORMANCE TEST (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
2-2.
PERFORMANCE TEST (CONT)
FRAME 5
Step
Procedure
Symptom
Maintenance Action
1.
Set circuit breaker switch (1)
...
...
to OFF.
2.
Put two pieces of black
...
...
thread (2) over gun tube (3)
(outside of tank at notches) to
form crosshairs. Use tape
or strap (4) to hold thread (2)
in place (TM 10). (Thread
must be tight).
3.
Using range finder (5), find
...
...
a target about 1200 meters
away.
WARNING
Do not set circuit breaker
switch (1) to ON until all
personnel and equipment are
out of the way of gun
movement.
4.
Set circuit breaker switch (1)
...
...
to ON.
5.
Using right side of binocu-
...
...
lars, look through firing
pin hole (6) in breech block
(7). (TM 10)
6.
Look through eyepiece (8)
Boresight and
Set circuit breaker switch to
of gunner's periscope (9).
synchronization error.
OFF.
Check that gunner's
a. Level gun to within plus .5
periscope (9) is boresighted
minus 1.5 mils and adjust
(aimed at same target as
rangefinder link connector
rangefinder (1)).
frame 6).
b. Place correct number of
turns on input shaft (Vol II,
para 4-4, frame 4 and para
4-5, frame 9).
GO TO FRAME 6
2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business