|
|
TM 9-1025-212-23&P
Section II. SERVICE UPON RECEIPT
The table below contains instructions for performing those services
This section contains instructions for services to be performed by the
required upon the receipt of this equipment.
using organization upon the receipt of a new or overhauled extractor
assembly. These services include unpacking, reprocessing, and
checking the extractor assembly.
SERVICE UPON RECEIPT EXTRACTOR ASSEMBLY
Location
Item
Action
Remarks
Extractor assembly
Extractor assembly
a. Unpack.
b. Inspect for broken,
cracked, rusted, cor-
roded, or missing
parts.
c. Lubricate.
d. Repack.
b. Check the equipment against the packing slip to see if the
shipment is complete. Report all discrepancies in accordance with
the instructions of TM 38-750.
a. Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged, report the damage on DF Form
c. Check to see whether the equipment has been modified.
364, Report of Discrepancy (ROD).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |