| |
- TECHNICAL MANUAL
- ENVIRONMENTAL/HAZARDOUS MATERIAL INFORMATION
- WARNING
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- PREPARATION FOR SHIPMENT FOR ARMY AH 64A HELICOPTER
- LIST OF EFFECTIVE PAGES
- LIST OF EFFECTIVE PAGES (Cont)
- TABLE OF CONTENTS
- TABLE OF CONTENTS (cont)
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS (cont)
- LIST OF ILLUSTRATIONS (cont)
- LIST OF TABLES
- Chapter 1. INTRODUCTION
- Figure 11. Basic Dimensions of AH-64A Helicopter
- CHARACTERISTICS OF SHIPMENT BY CARGO AIRCRAFT.
- Chapter 2. SHIPMENT BY CARGO AIRCRAFT
- Figure 21. Helicopter Preloading Condition for C-5 Cargo Aircraft Shipment
- Loading, Tiedown, and Offloading
- Table 21. Equipment Requirements for AH-64A Helicopter C-5 and C-17 Cargo Aircraft Shipment (Sheet 1 of 3)
- Table 21. Equipment Requirements for AH-64A Helicopter C-5 and C-17 Cargo Aircraft Shipment (Sheet 2 of 3)
- Table 21. Equipment Requirements for AH-64A Helicopter C-5 and C-17 Cargo Aircraft Shipment (Sheet 3 of 3)
- Section II. SHIPMENT BY C5 CARGO AIRCRAFT, FRONT DOOR LOADING AND UNLOADING
- Remove Main Rotor Blades.
- Position Drive Train.
- Figure 23. Removal and Installation of Main Rotor DeIce Power Distributor and Air Data System (ADS) Mast
- Figure 24. Removal and Installation of Fairings and Access Covers
- Remove 30MM Gun Wire Deflector.
- Figure 2-6. Removal and Installation of Horizontal Stabilator
- Remove Two Tail Rotor Blades (Helicopters Number One, Three, and Five Only).
- Remove and Stow Wings.
- Figure 28. Removal and Installation of Antennas
- Install Fly Away Covers.
- Figure 29. Removal, Stowage, and Installation of Wings (Sheet 1 of 2)
- Figure 29. Removal, Stowage, and Installation of Wings (Sheet 2 of 2)
- MARKING.
- Army Unit Responsibilities During Loading.
- Figure 212. Tail Wheel Approach Shoring
- Verify Preliminary Safety Procedures.
- Figure 214. Tail Wheel Swivel Lock and Yoke Components
- Load Four Main Rotor Blades
- Load Helicopter Number Three Tail First.
- Load Four Main Rotor Blades
- Load Four Main Rotor Blades.
- Figure 217. Tiedown Diagram
- HELICOPTER OFFLOADING (C5 AIRCRAFT, FRONT DOOR).
- Unload Four Main Rotor Blades
- Unload Two Horizontal Stabilators.
- Install Wings.
- Install Two Tail Rotor Blades.
- Install 30MM Gun Wire Deflector.
- Section III. SHIPMENT BY C-5 CARGO AIRCRAFT, REAR DOOR LOADING AND UNLOADING
- Remove and Stow Wings
- MARKING.
- Figure 219. Tail Wheel Approach Shoring (Rear Door Loading)
- Load Four Main Rotor Blades
- Figure 220. Main Gear Approach Shoring (Rear Door Loading)
- Load Four Main Rotor Blades.
- Load One Horizontal Stabilator
- Load Shoring
- Unload Helicopter Number Three.
- Unload Two Horizontal Stabilators.
- Install Main Landing Gear Wire Cuters
- Section IV. SHIPMENT BY C141B CARGO AIRCRAFT
- Figure 22. Helicopter Preloading Condition for C-141B Cargo Aircraft Shipment
- Table 22. Equipment Requirements for AH64A Helicopter C141BN Cargo Aircraft Shipment (Sheet 1 of 3)
- Table 22. Equipment Requirements for AH64A Helicopter C141BN Cargo Aircraft Shipment (Sheet 2 of 3)
- Table 22. Equipment Requirements for AH64A Helicopter C141BN Cargo Aircraft Shipment (Sheet 3 of 3)
- Remove Fairings and Access Covers.
- Figure 223. Removal and Installation of Main Rotor Head and Mast Unit (Sheet 1 of 3)
- Figure 223. Removal and Installation of Main Rotor Head and Mast Unit (Sheet 2 of 3)
- Figure 223. Removal and Installation of Main Rotor Head and Mast Unit (Sheet 3 of 3)
- Figure 224. Installation of Main Rotor Head and Mast Unit in Shipping Carrier
- Remove Ice Detector.
- Figure 225. Installation of Tail Landing Gear Strut Lock
- Figure 226. Removal, Stowage, and Installation of Vertical Stabilizer (Sheet 1 of 4)
- Figure 226. Removal, Stowage, and Installation of Vertical Stabilizer (Sheet 2 of 4)
- Figure 226. Removal, Stowage, and Installation of Vertical Stabilizer (Sheet 3 of 4)
- Figure 226. Removal, Stowage, and Installation of Vertical Stabilizer (Sheet 4 of 4)
- Figure 227. Vertical Stabilizer Sling Nominal Strap Adjustment
- Perform Preservation Procedures.
- MARKING.
- Load Two Main Rotor Head and Mast Units.
- Figure 2-28.1. C-141B Cargo Aircraft Loading Ramp and Shoring Configuration
- Load First Helicopter NoseIn.
- Figure 2-29. C-141B Cargo Aircraft Nose-In Helicopter Loading Profile
- Load Second Helicopter TailIn.
- Load Second Helicopter TailIn. (Cont)
- Figure 2-30. C-141B Cargo Aircraft Tail-In Helicopter Loading Profile
- Figure 231. Positioning of Jack Adapters at Vertical Stabilizer
- Figure 232. Jack Adapters for Vertical Stabilizer
- Load Two Main Rotor Blades.
- Remove Helicopter Tiedowns.
- Unload One M230 Gun Turret.
- HELICOPTER PREPARATION FOR USE AFTER C141B SHIPMENT.
- Install Vertical Stabilizer
- Install Main Rotor Head and Mast Units
- Install Main Rotor Head and Mast Units (COnt)
- Install Removed Fairings and Access Panels
- Section V. SHIPMENT BY C-17 CARGO AIRCRAFT
- Figure 2-33. Helicopter Preloading Condition for C-17 Cargo Aircraft Shipment Tactical Shipment and Maximum Density (Logistical) Shipment
- Install Forward Fuselage Tiedown Fittings.
- Figure 234. Secure Tail Rotor
- SHIPMENT (MAXIMUM DENSITY (LOGISTICAL)( CONFIGURATION)
- Remove Fairings and Access Covers.
- Figure 235. Prefabricated Approach Ramp and Shoring
- Figure 236. Alternate Shoring
- Figure 237. Ramp Pedestal Shoring
- Figure 238. Roller Tray Shoring
- PLACE SHORING.
- Figure 239. Winching Bridle/Nose First Loading
- Load Second Helicopter Tail First.
- Figure 240. Two Helicopters Operational (Tactical Configuration)
- Figure 241. Secondary Approach Shoring Ramps Tail First Loading
- Load First Helicopter Nose First.
- Figure 242. Three Helicopters Maximum Density (Logistical) Shipment
- Load Second Helicopter Tail First.
- Load Four Main Rotor Blades.
- OffLoad Second Helicopter.
- Off Load First Helicopter.
- HELICOPTER PREPARATION FOR USE AFTER C-17 SHIPMENT (TACTICAL SHIPMENT).
- Remove Forward Fuselage Tiedown Fittings
- HELICOPTER PREPARATION FOR USE AFTER C-17 SHIPMENT (MAXIMUM DENSITY (LOGISTICAL) SHIPMENT).
- Chapter 3. SHIPMENT BY VESSEL
- Figure 3-1. Operationally Ready Helicopter Preloading Condition For Vessel Shipment
- Figure 3-2. High Density Helicopter Preloading Condition For Vessel Shipment
- Figure 3-3. Maximum Density Helicopter Preloading Condition For Vessel Shipment
- Table 31. Equipment Requirements for AH64A Helicopter Vessel Shipment (Sheet 1 of 3)
- Table 31. Equipment Requirements for AH64A Helicopter Vessel Shipment (Sheet 2 of 3)
- Table 31. Equipment Requirements for AH64A Helicopter Vessel Shipment (Sheet 3 of 3)
- HELICOPTER PREPARATION FOR VESSEL SHIPMENT
- Section II. SHIPMENT BY VESSEL
- Load Each Helicopter From Dockside
- HELICOPTER OFFLOADING.
- Figure 34. Vessel Below Deck Tiedown Diagram
- Figure 35. Vessel Topside Tiedown Diagram
- Remove Tiedowns from Helicopters.
- Inspect Helicopter
- Chapter 4. SHIPMENT BY TRUCK
- Figure 4-1. Helicopter Preloading Condition For Commercial Truck Shipment
- Figure 4-2. Helicopter Preloading Condition For Military M270A1 Truck Shipment
- SECURITY OF HELICOPTER.
- Table 41. Equipment Requirements for AH64A Helicopter Truck Shipment (Sheet 1 of 3)
- Table 41. Equipment Requirements for AH64A Helicopter Truck Shipment (Sheet 2 of 3)
- Table 41. Equipment Requirements for AH64A Helicopter Truck Shipment (Sheet 3 of 3)
- Table 42. Height Diagram, Static/Knelt, Different Configurations for Truck Shipment
- Section II. SHIPMENT BY TRUCK
- MARKING.
- Figure 4-3. Truck Shipment Loading and Tidedown (40 foot trailer)
- Figure 4-4. Truck Shipment Loading and Tidedown (50 foot trailer)
- Figure 4-5. Truck Shipment Loading and Tidedown (Military M270A1 trailer)
- Tiedown Helicopter.
- Load and Tiedown Removed Components and Support Equipment.
- HELICOPTER OFFLOADING (TRUCK SHIPMENT)
- Install Vertical Stabilizer.
- Chapter 5. CRATED SHIPMENT
- Chapter 6. TACTICAL SHIPMENT
- Chapter 7. PREPARATION FOR SHIPMENT
- Chapter 8. OPERATOR INSTRUCTIONS, TRANSPORTABILITY EQUIPMENT HYDRAULIC CART ASSEMBLY, AIR TRANSPORT
- Figure 81. Hydraulic Cart Components
- KNEEL HELICOPTER.
- Figure 82. Main Landing Gear Kneeling SetUp
- Extend Struts.
- ERECT HELICOPTER.
- Raise Helicopter.
- Section III. KNEELING AND ERECTING OPERATIONS FOR C5 SHIPMENT
- ERECT HELICOPTER (OUTSIDE C5 CARGO AIRCRAFT).
- Appendix A: REFERENCES
- Appendix B: PRESERVATION / DEPRESERVATION WORKSHEET
- Appendix C: WEIGHT AND BALANCE FOR SHIPMENT
- Appendix D: CONSUMABLE MATERIALS
- CONSUMABLE MATERIALS LIST.
- CONSUMABLE MATERIALS LIST. (Cont)
- Appendix E: SPECIAL TOOLS AND EQUIPMENT
- Appendix F: QUARANTINE INSPECTION
- Appendix G: HEAT SHRINK FILM HELICOPTER PROTECTIVE COVERING
- SAFETY:
- Table G2. Safety Checksheet
- APPLICATION OF FILM:
- Fusing Film Pieces Together.
- INSTALLATION OF VENTILATORS:
- DEPRESERVATION:
- Appendix H: REPAIR PARTS AND SPECIAL TOOLS LIST
- HOW TO LOCATE PARTS.
- Figure H1. GROUP 80 SPECIAL TOOLS ACTUATOR SUPPORT SET
- Repair Parts List
- Figure H2. GROUP 80 SPECIAL TOOLS FORWARD FUSELAGE TIEDOWN FITTING
- Repair Parts List
- Figure H3. GROUP 80 SPECIAL TOOLS FORWARD WINCHING ADAPTER CABLE
- Repair Parts List
- Figure H4. GROUP 80 SPECIAL TOOLS FUSELAGE STATION 450 SUPPORT
- Repair Parts List
- Figure H5. GROUP 80 SPECIAL TOOLS HYDRAULIC HOSE KIT
- Repair Parts List
- Figure H6. GROUP 80 SPECIAL TOOLS HYDRAULIC CART
- Repair Parts List
- Figure H7. GROUP 80 SPECIAL TOOLS MAIN ROTOR BLADE RACK SET
- Repair Parts List
- Figure H8. GROUP 80 SPECIAL TOOLS MAIN TRANSMISSION SHIPPING COVER
- Repair Parts List
- Figure H9. GROUP 80 SPECIAL TOOLS STABILATOR ACTUATOR SUPPORT
- Repair Parts List
- Figure H10. GROUP 80 SPECIAL TOOLS TAIL LANDING GEAR STRUT LOCK
- Repair Parts List
- Figure H11. GROUP 80 SPECIAL TOOLS TAIL ROTOR BLADE SUPPORT
- Repair Parts List
- Figure H12. GROUP 80 SPECIAL TOOLS TAIL WHEEL STEERING BAR/WINCHING YOKE
- Repair Parts List
- Figure H13. GROUP 80 SPECIAL TOOLS VERTICAL STABILIZER STOWING KIT
- Repair Parts List
- Figure H14. GROUP 80 SPECIAL TOOLS WING STOWING KIT
- Repair Parts List
- Figure H15. GROUP 80 SPECIAL TOOLS MAIN ROTOR HEAD, MAST, AND MIXER SHIPPING CARRIER
- Repair Parts List
- Figure H16. GROUP 80 SPECIAL TOOLS VERTICAL STABILIZER JACK ADAPTER
- Repair Parts List
- GLOSSARY
- GLOSSARY (Cont)
- GLOSSARY (Cont)
- INDEX
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- Figure FO-1. C-5 Cargo Aricraft Loading Pattern and Tiedown Diagram
- Figure FO-2. C-141B Cargo Aricraft Loading Pattern and Tiedown Diagram
- Instructions for sending an electronic 2028
- The Metric System and Equivalents
- By Order of the Secretary of the Army:
- Blank Page
- Blank Page
- TM-55-1520-238-S
- Blank Page
- Distribution:
- Blank Page
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank PAge
- Blank PAge
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- Blank Page
- DISTRIBUTION:
- Blank Page
- DISTRIBUTION STATEMENT:
- Blank PAge
- Blank Page
- Blank PAge
- Blank Page
- Blank PAge
- INDEX (Cont)
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- Blank PAge
- Blank PAge
- Blank PAge
- Blank PAge
- Blank PAge
- Blank Page
- DISTRIBUTION
- Blank Page
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank PAge
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
|