Click here to make tpub.com your Home Page

Page Title: Figure 2-22. Fume Hood (Unit No. 19)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6640-214-14
1. Blower chamber
4. Gas outlet
2. Sash
5. Electric outlet
3. Compressed air outlet
6. Water outlet
Figure 2-22. Fume Hood (Unit No. 19)
(2) Connect electric cord to electric outlet, and connect the gas, air, and water outlets to proper service lines.
(3) Connect exhaust ducts to blower opening at top of hood and to a suitable opening in exterior wall of
laboratory.
(4) To start exhaust blower motor, push switch at left exterior base to ON position.
c. Preventive Maintenance. Preventive maintenance consists of lubricating the fan motor as required, cleaning
equipment and checking fittings and connections for tightness.
Change 1 2-41

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business