| |
- OPERATOR'S ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL
- OPERATOR'S ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL
- WARNING
- WARNING
- WARNING
- WARNING
- TABLE OF CONTENTS
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS (Continued)
- CHAPTER 1 INTRODUCTION
- HAND RECEIPT
- DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE
- REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR)
- Figure 1-1. Unit of Cabinets Assembled Along Left Wall, Forward Portion
- Figure 1-2. Unit of Cabinets Assembled Along Left Wall, Rear Portion
- Figure 1-3. Unit of Cabinets Assembled Along End Wall
- Figure 1-4. Unit of Cabinets Assembled Along Right Wall, Rear Portion
- Figure 1-5. Unit of Cabinets Assembled Along Right Wall, Forward Portion
- CABINET UNITS
- TABULATED DATA
- TABULATED DATA
- CHAPTER 2 OPERATING INSTRUCTIONS
- Figure 2-1. Shipping Container and Platform (81337) 5-14-341
- Figure 2-2. Shipping Container, Closed and Locked (81337) 5-14-341
- Section II. SETTING-UP PROCEDURES
- CONNECTING SERVICE LINES
- Figure 2-4. Proposed Layout for Petroleum Base Laboratory in Baker Building
- Figure 2-5. Flexible Metal Braided Hose Used to Connect Service Lines Around a Corner
- CONNECTING SERVICE LINES. cont'd
- Figure 2-6. Wiring Diagram for Unit of Six Cabinets
- Figure 2-7. Wiring Diagram for Low Temperature Kinematic Viscosimeter.
- Figure 2-8. Wiring Diagram for Cloud- and Pour-Point Apparatus.
- Figure 2-9. Wiring Diagram for Channel Point Apparatus.
- Section III. OPERATION AND MAINTENANCE
- Safety Precautions
- Safety Precautions cont'd
- Handling Chemicals
- Controlling Pressure and Vacuum
- Controlling Fumes
- Electrical Safety
- Figure 2-10. Water Bath and Electric Oven Cabinet.(Unit No. 1)
- Figure 2-11. Collapsible Laboratory Stool.
- HIGH TEMPERATURE KINEMATIC VISCOSIMETER CABINET
- Figure 2-12. High Temperature Kinematic Vicosimeter Cabinet. (Unit No. 2)
- DISTILLATION CABINETS
- Figure 2-13. Distillation Cabinet (Double) (Unit No. 3)
- Figure 2-14. Distillation Cabinet (Single) (Unit No. 4)
- MUFFLE FURNACE AND PENETROMETER CABINET
- Muffle furnace
- GUM APPARATUS CABINET
- Figure 2-16. Gum Apparatus Cabinet. (Unit No. 6)
- WATER STILL CABINET
- Figure 2-17. Water Still Cabinet (Unit No. 7)
- TETRAETHYL LEAD AND SULFUR DETERMINATIOUN APPARATUS CABINET
- Figure 2-18. Tetraethyl Lead and Sulfur Determination Apparatus Cabinet (Unit No. 8)
- Figure 2-18.1. Glassware Storage Cabinet (Units No. 9 thru 14, 24 and 26)
- Figure 2-18.2. Chemical Storage Cabinet (Unit No. 15)
- STORAGE CABINETS
- Figure 2-19. Balance Cabinet (Unit No. 16)
- BOOKCASE
- Figure 2-20. Sink Cabinet, with Equipment Prepared for Shipment or Storage (Unit No. 17)
- Figure 2-21. Oxidation Stability Cabinet (Unit No. 18)
- FUME HOODS
- Figure 2-22. Fume Hood (Unit No. 19)
- LOW TEMPERATURE KINEMATIC VISCOSIMETER CABINET
- Figure 2-23. Low Temperature Kinematic Viscosimeter Cabinet (Unit No. 20)
- Figure 2-24. Refrigerator Cabinet (Unit No. 21)
- Figure 2-25. Cloud- and Pour-Point Apparatus Cabinet (Unit No. 22)
- AIR COMPRESSOR
- Figure 2-26. Air Compressor (Unit No. 23)
- CENTRIFUGE AND CHANNEL POINT APPARATUS CABINET
- Figure 2-27. Centrifuge and Channel Point Apparatus Cabinet (Unit No. 25)
- CONSTANT TEMPERATURE BATH, REID VAPOR PRESSURE (RVP)
- GAS CYLINDERS
- GAS CYLINDERS cont'd
- ANEROID BAROMETER
- MANOMETER
- Figure 2-28. Analytical Balance
- Figure 2-29. Analytical Balance, Side View
- Figure 2-30. Top View of Analytical Balance
- Scale focusing
- CHAPTER 3 OPERATOR/CREW MAINTENANCE INSTRUCTIONS
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Table 3-1. Preventive Maintenance Checks and Services
- Section II. TROUBLESHOOTING
- Table 3-2. Troubleshooting
- MANOMETER HIGH OR LOW PRESSURE READING
- EXCESSIVE STARTING AND STOPPING OF AIR COMPRESSOR
- BATH DRAIN HAS BEEN OPENED BUT WATER DOES NOT RUN OUT
- REFRIGERATOR EVAPORATOR OR COILS WITH EXCESSIVE FROST BUILDUP
- CHAPTER 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
- Figure 4-1. Types of Multimeters
- Figure 4-2. Zeroing the AN/URM-105 Meter (Sheet 1 of 3)
- Figure 4-2. Zeroing the TS-352B/U (Sheet 2 of 3)
- Figure 4-2. Zeroing the Simpson 160 (Sheet 3 of 3).
- Figure 4-3. TS-352 Continuity Test
- Figure 4-4. Testing for Shorts.
- Figure 4-5. Testing Resistance
- Figure 4-6. Reading the Ohm Scale.
- Figure 4-7. DC Volts Scale (AN/URM-105) (Sheet 1 of 3).
- Figure 4-7. DC Volts Scale (TS-352B/U) (Sheet 2 of 3).
- Figure 4-7. DC Volts Scale (Simpson 160) (Sheet 3 of 3)
- Figure 4-8. Measuring DC Voltage.
- Figure 4-9. Reading DC Voltage (Simpson 160).
- Figure 4-10. Reading DC Voltage (TS-352B/U).
- Figure 4-11. AC Volt Scale (AN/URM-105).
- Figure 4-13. AC Volt Scale (TS-352B/U)
- Figure 4-14. AC Volt Scale (Simpson 160)
- Figure 4-15. Measuring AC Voltage.
- Table 4-1. Oven Troubleshooting Chart
- Heater bank
- MANOMETER
- Table 4-2. Manometer Troubleshooting Chart
- Before Operation Service
- Table 4-3. Vacuum Pump Troubleshooting Chart
- CHAPTER 4 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
- Table 5-1. Air Compressor Troubleshooting Chart
- COMPRESSOR RUNNING HOT
- Figure 5-1. Muffle Furnace Disassembly.
- REID VAPOR PRESSURE BOMB BATH
- Table 5-2. Reid Vapor Pressure Bomb Bath Troubleshooting Chart
- REFRIGERATOR
- Troubleshooting
- Table 5-3. Refrigerator Troubleshooting Chart
- COMPRESSOR RUNS CONTINUOUSLY
- APPENDIX A REFERENCES
- REFERENCES cont'd
- REFERENCES cont'd
- APPENDIX B MAINTENANCE ALLOCATION CHART
- COLUMN ENTRIES USED IN THE MAC.
- COLUMN ENTRIES USED IN TOOL AND TEST EQUIPMENT REQUIREMENTS
- Section II. MAINTENANCE ALLOCATION CHART
- Section II. MAINTENANCE ALLOCATION CHART
- Section II. MAINTENANCE ALLOCATION CHART
- Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS
- Section IV. REMARKS
- APPENDIX C COMPONENTS OF END ITEMS LIST
- EXPLANATION OF COLUMNS cont'd
- Table
- Table
- Table
- Table
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- Section II. COMPONENTS OF END ITEMS
- APPENDIX D TEXTBOOK LISTING FOR PETROLEUM BASE LABORATORY
- TEXTBOOK LISTING FOR PETROLEUM BASE LABORATORY
- INDEX
- INDEX - Continued
- INDEX - Continued
- The Metric System and Equivalents
- TM-5-6640-214-14
- Blank Page
- DISTRIBUTION
- Recommended Changes to Equipment Technical Publications
|