Click here to make tpub.com your Home Page

Page Title: Tank
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6640-213-14
Pump assembly includes: . . . . . . . . . . . Positive-negative pump, motor,
positive and negative gages, and
outlet filter silencers
2.  Tank.  The air suge tank ensures a continuous
air flow.  A relief valve, located on the air surge tank, is set to
open at 25 psi (1.76 kg/sq cm).  A T-fitting and a gate valve located
in the air pressure line provide the option of delivering pressure
either to the manometer or to the tabletop-mounted air stopcock for
other operations.  The manometer, located in the left-hand corner of
the laboratory, reads the line pressure.  A pressure regulator is
placed in the pressure line in a position where it can be adjusted by
a technician while he observes the manometer, or while he checks a
Reid vapor pressure (RVP) gage connected to the end of the air
pressure line.  The vacuum outlet on the pump is connected directly
to a tabletop-mounted stopcock located to the left of the sink.
(b) Operating Instructions.
Make sure that the pressure regulator is set for
zero pressure before turning on the pump.
1.  To supply air pressure to the tabletop-
mounted stopcock (8), proceed as follows:
(a) Close the needle valve (3, fig. 2-4) in
the line downstream of the T-fitting leading to manometer (9).
(b) Set the ON-OFF switch, located in wire
..
mold to the left of the sink, in the ON position.
(c) Allow time for pressure to build up in
the tank.
(d) Open and close the tabletop-mounted air
"Air," as needed
stopcock marked
NOTE
The 25 psi relief valve (4) relieves the pressure
when 25 psi (1.76 kg/sq cm) pressure is reached in
the tank.  Do not operate the pump needlessly.
2.  To supply air pressure to the manometer for
calibrating RVP gages, proceed as follows:
2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business