Click here to make tpub.com your Home Page

Page Title: CHAPTER 6 REPAIR OF GRID WIRE SENSOR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-6350-264-14&P-6
NAVELEX EE181-AA-OMI-1/E121 DT-545
TO 31S9-2FSS9-1-6
CHAPTER 6
REPAIR OF GRID WIRE SENSOR
6-1. REPAIR OF GRID WIRE. Repair of the grid wire
6-2. CHECKOUT PROCEDURE.
After repair,
test
is restricted to reconnecting/patching a broken wire.
GWS for proper operation.
a. Remove covering as necessary to locate broken
a. Tag and disconnect grid wires from TBl-1 and TB1-
wire.
2. Set multimeter to ohms and connect leads to
wires removed from TBl-1 and TB1-2.  Meter
b. Clean coating (1/2 inch, 1.27 cm) from ends of
should indicate less than 2 ohms.
broken wire and piece of wire to be used as patch.
b. Tag and disconnect grid wires from TB1-3 and TB1-
c. Using a crimp connection method, attach patch wire
4.  Connect meter leads to wires removed from
to broken wire ends of installed grid wire.
TB1-3 and TB1-4.Meter should indicate less than 2
ohms.
d. Install previously removed covering (if applicable).
c. Remove meter leads from TB1-3 and TB1-4.
Reconnect wires to TB1.
6-1/(6-2 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business