Click here to make tpub.com your Home Page

Page Title: Section III. GENERAL MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-264-14&P-11
NAVELEX EE 181-AA-OMI-120/E121 C-7359-60-1
T.O. 31S9-2FSS9-1-11
Section III.
GENERAL MAINTENANCE
5-4. MAINTENANCE ACTION. The extent of direct and general support maintenance is governed by the Maintenance
Allocation Chart (MAC), Appendix B. The MAC provides for on-site test and replacement of batteries, Signal Modules,
Sta- tus Monitor Modules, connectors, power supplies, fuses, lamps, and switches. The MAC also provides for repair of
the Signal Module by on site test and replacement of the logic subassembly PC board and the audible signal device.
The MAC provides for inspection and replacement of batteries and lamps.
Section IV.
REMOVAL AND REPLACEMENT OF MAJOR COMPONENTS AND ASSEMBLIES
5-5. REMOVAL AND INSTALLATION PROCEDURES.
a.
To remove one-zone Monitor Cabinet battery, unlock and open cabinet door. Unlatch and swing out mounting
rack. Position power supply switch S1 to POWER OFF. Remove mounting screws that hold Status Monitor
Module in position. Remove module from mounting rack. Disconnect battery terminal leads. Slide battery to
the right and remove from cabinet.
b.
To install new one-zone Monitor Cabinet battery, position battery in cabinet and connect terminal leads.
Position Status Monitor Module in mounting rack (ensure that connector is properly engaged) and install
mounting screws. Close and latch mounting rack. Close and lock the cabinet door.
c.
To remove five-zone Monitor Cabinet battery, unlock and open cabinet door. Unlatch and swing out mounting
rack. Position power supply switch S1 to POWER OFF. Disconnect battery terminal leads and remove
battery.
d.
To install new five-zone Monitor Cabinet battery, position battery in cabinet and connect terminal leads. Close
and latch mounting rack. Close and lock cabinet door.
e.
To remove twenty-five-zone Monitor Cabinet battery, unlock and open cabinet door. Position power supply
switch S1 to POWER OFF. Disconnect battery leads. Lift battery and remove from cabinet.
f.
To install new twenty-five-zone Monitor Cabinet battery, position battery in cabinet and connect terminal
leads. Close and lock cabinet door.
g.
To remove Signal Module, unlock and open Monitor Cabinet door. Unlatch and swing out mounting rack. Tag
and remove wires from terminal boards TB1, located on back of Signal Module. Remove the mounting
screws and remove Signal Module.
h.
To install new Signal Module, position module in mounting rack and install mounting screws. Connect wires to
terminal board TB1. Close and latch mounting rack. Close and lock cabinet door.
i.
To remove connector, unlock and open cabinet door.  Unlatch and swing out mounting rack.  Remove
mounting screws that hold Status Monitor Module in position. Remove module from the mounting rack. Tag
wires and use a soldering iron of 50 watts maximum to disconnect wires from connector.
5-47

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business