|
|
TM 5-6350-264-14&P-11
NAVELEX EE 181-AA-OMI-120/E121 C-7359-40-1
T.O. 31S9-2FSS9-1-11
Table 5-1. Troubleshooting Procedures - Continued
Trouble
Probable cause
Corrective Action
20. (Cont)
b.
(Cont)
position. Remove module
from mounting rack. Dis-
connect battery terminal
leads. Slide battery to the
right and remove from cab-
inet.
(2)
To install new one-zone Mon-
itor Cabinet battery, posi-
tion battery in cabinet and
connect terminal leads.
Position Status Monitor
Module in mounting rack
(ensure that connector is
properly engaged) and in-
stall mounting screws.
Close and latch mounting
rack. Close and lock cabi-
net door.
(3)
To remove five-zone Monitor
Cabinet battery, position
power supply switch S1 to
POWER OFF. Disconnect
battery terminal leads and
remove battery.
(4)
To install new five-zone Mon-
itor Cabinet battery, posi-
tion battery in cabinet and
connect terminal leads.
Close and latch mounting
rack. Close and lock cab-
inet door.
(5)
To remove twenty-five-zone
Monitor Cabinet battery,
position power supply
switch S1 to POWER OFF.
Disconnect battery leads.
Lift battery and remove
from cabinet.
(6)
To install new twenty-five-
zone Monitor Cabinet bat-
tery, position battery in
5-38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |