TM 5-6350-262-14/7/NAVELEX 0967-466-0970/TO 31S9-4-28-1
Section V. DIRECT SUPPORT TESTING PROCEDURES
(1) Power Supply (nomenclature unassigned}
7-11. General.
(2) VOM, TS352B.
This section contains a performance standard test
(3) Test lead (41
procedure which should be used to determine whether
(4) 3/16 X 4 flat-blade screwdriver from Tool Kit,
the performance of the alarm switch is satisfactory for
TK105G.
installation or use. These procedures may also be used
b. Initial Test Equipment Settings.
at the installation site by disconnecting system
(1) Remove alarm switch cover.
interconnecting wiring from terminals TBI-1, -2, -5, and
(2) Connect power supply positive lead to alarm
4- and utilizing system supplied 20 volts dc in lieu of the
switch TB1-7. Connect negative lead to TB1-8.
power supply. (Para. ).
(3) Set power supply output control for 20 volts
7-12. Performance Standards.
dc.
a. Test Equipment and Materials.
(4) Set power supply switch to "ON".
c. Procedure. Refer to table 7-1.
Control settings
Step
Equipment under
No.
Test equipment
test
Test procedure
Performance standard
a. Press reset
a. None.
1
TS352B:
N/A
R x 100 (zero
switch S2.
b. Connect TS352B
a. Meter should in-
meter)
test leads between
dicate less than
TBI-1 and -2.
2000 ohms
b. Alarm light should
not illuminate.
c.
a. Meter should in-
Actuate alarm
switch S1.
dicate more than
100, 000 ohms.
b. Alarm light should
illuminate and
remain on.
d. Press reset
a. Alarm light should
switch S2.
go out
a. Disconnect power
a. None.
2
DC power supply:
N/A
supply leads
Power switch: OFF
3
TS352B:N/A
a. Connect TS352B
a. Meter should in-
R x 100 (zero
test leads between
dicate more than
meter)
TB1-5 and -.
100, 000 ohms.
b. Press tamper
a. Meter should in-
switch S3.
dicate less than
4
N/A
N/A
a. Disconnect TS352B
2000 ohms.
test leads and in-
stall alarm switch
cover.
7-5
|