TM 5-6350-262-14/5
NAVELEX 0967-466-9050
TO 31S9-4-38-1
CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SITE AND SHELTER REQUIREMENTS
(1) The control unit requires 115-volt ac 60-Hz power for
2-1. Siting
operation.
a. The control unit is the central control element of the J-
(2) The site should allow for convenient routing of
SIIDS. As such the total system requirements must be
interconnecting wiring through rigid conduit to other system
evaluated by the using organization before selecting an
components.
installation site. The control unit is normally installed in a
room having locks on all entrances (doors and windows) to
2-2. Shelter Requirements
prevent entry by unauthorized personnel. Surveillance of the
room for unauthorized entry may also be maintained utilizing
The control unit is designed for wall mounting and can be
J-SIIDS instrusion detection sensors.
installed on practically any surface having sufficient strength
to support the 74-pound maximum weight of the unit. Figure
b. The following factors must be considered when selecting a
shows
the
wall
space
requirements.
location for the control unit.
2-1
|