Page Title: Chart 7-2. Processor/Detector Vibration Signal Performance Test Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Step
Test equipment
Test procedure
Performance standard
c. Apply a continuous pulse for 5
Multimeter should indicate greater than
seconds.
100K (alarm condition).
d. Short circuit the INT test point to
Multimeter should indicate greater than
signal ground to discharge inte-
100 K (alarm condition).
grator capacitor C18. Apply 4
Observe that the alarm condition dura-
pulses (100 milliseconds duration)
tion is 0.5 to 1.5 seconds.
over a 15 second period.
4.
Multimeter as a
Connect as continuity measurement
a. The tamper switch should open
continuity check.
between terminals 5 and 6 of TBI
(infinity indication) with no less
on the processor.
than 1/8 inch nor more than 1/4
inch of cover displacement.
b. Pull the tamper switch plunger out
and verify that continuity is restored
(near zero resistance).
c. Replace cover and verify that con-
tinuity is again obtained (near zero
resistance).
5.
Multimeter as a
Connect as continuity measurement
a. The tamper switch should open (infin-
continuity check.
between terminals 5 and 6 of TBI
ity indication) with no less than 1/8 inch
on the detector.
nor more than 1/4 inch of cover dis-
placement.
b. Pull the tamper switch plunger out and
verify that continuity is restored (near
zero resistance).
c. Replace cover and verify that con-
tinuity is again obtained (near zero
resistance.