|
|
original manufacturing standards. Rebuild is the highest
is provided for referencing by code the special tools and
degree of materiel maintenance applied to Army
test equipment, (sec III) required to perform the
equipment. The rebuild operation includes the act of
maintenance functions (sec II).
e. Column (5), Remarks. This column is provided
returning to zero those age measurement (hours/miles,
etc.)
considered
in
classifying
Army
for referencing by code the remarks (sec IV) pertinent to
equipment/components.
the maintenance functions.
d. Column (4), Tools and Equipment. This column
Section II. MAINTENANCE ALLOCATION CHART
(1)
(2)
(3)
(4)
(5)
Assembly Group
Maintenance functions
Tools and
Remarks
equipment
A
B
C
D
E
F
G
H
I
JK
J-SIID SYSTEM
01
Transmitter, Data .............................................. ...... ...... ...... ........ ...... ......F ... F
0.5 0.5
02
Receiver, Data .................................................. ...... ...... ...... ........ ...... ......F ... F
0.5 0.5
F-Facility
Engineer
Maintenance
B-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |