|
|
Code
Explanation
the restoration of unserviceable equipment to a like
d. Column (4), Tools and Equipment. This column
new condition in accordance with original manufac-
is provided for referencing by code the special tools
turing standards Rebuild is the highest degree of
and test equipment (sec III) required to perform the
material maintenance applied to Army equipment.
maintenance functions (Section II).
The rebuild operation includes the act of returning to
e. Column (5), Remarks. This column is provided
zero those age measurement (hours/miles, etc.)
considered in classifying Army equip
for referencing by code the remarks (sec IV)
ment/components.
pertinent to the maintenance functions.
Section II. MAINTENANCE ALLOCATION CHART
(3)
Maintenance Functions
(4)
(5)
(1)
(2)
Tools and
Remarks
Group
Assembly group
equipment
No.
01 SENSOR GRIDE WIRE
F
F
0101
JUNC BOX. . . . . . . . . . . . .
1.5
1 .5
F
F
F
0102
GASKET . . . . . . . . . . . . . . .
0.1
0.2
0.2
F
F
SWITCH/BRKT (E3410). . .
0103
0.8
0.8
SWITCH (E4310) . . . . . . . . . . .
F
F
0104
0.6
0.6
F-Field
Engineer
Maintenance
B-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |