Click here to make tpub.com your Home Page

Page Title: Tap Changer Drive Mechanism Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

engage a pin in the tap changer shaft without difficulty if
4-11. Tap Changer Drive Mechanism Installation
both mechanisms are in the proper position.
a. See  that  the  tap  changer  and  the  drive
c. . Secure the flange with its bolts.
mechanism are both on position "ONE". The tap changer
d. After installation check to see that the wedge
is on position "ONE" when the wedge bridges tap lead A
seats itself properly in each position by observing the
and B and the index marks on the drive shaft and support
torque required to turn the drive mechanism in each
structure are in line with one another.
direction. The mechanism will be at the center of a high
b. Place the drive shaft through the opening in the
torque region when the wedge is properly seated. If the
mounting flange and slide the coupling over the tap
device was correctly reassembled the position indicator
(changer shaft. The slotted end of the coupling shoulder
should accurately show the various positions.
4-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business