Click here to make tpub.com your Home Page

Page Title: APPENDIX C BASIC ISSUE ITEMS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6115-423-15
APPENDIX C
BASIC ISSUE ITEMS
Section 1. INTRODUCTION
Scope
1.
X
Applied to parts and assemblies which are
This appendix lists items which accompany
not procured or stocked, the mortality
the load bank or are required for installation,
of which is normally below that of the
applicable end item, and the failure of
operation, or operator's maintenance.
which should result in retirement of
the end item from the supply system.
2. General
Applied to repair parts which are not pro-
Xl
cured or stocked, the requirement for
Basic Issue Items-Section II. This section
which will be supplied by use of the
is a listing of accessories, repair parts, tools,
next higher assembly or components,
and publications required for operator's main-
Applied to repair parts which are not
X2
tenance and operation, initially issued with, or
stocked.  The indicated maintenance
authorized for the load bank.
category requiring such repair parts
will attempt to obtain them through
if not  obtainable
cannibalization;
3. Explanation of Columns
through cannibalization, such repair
parts will be requisitioned with sup-
The following provides an explanation of
ing justification through normal supply
columns in the tabular list of basic issue items,
channels.
Section II:
Applied to repair parts authorized for lo-
C
cal- procurements. If not obtainable
a. Source, Maintenence, and Recoverability
from local procurement, such repair
Codes (SMR), Column 1 :
parts will be requisitioned through nor-
mal supply channels with a supporting
(1) Source Code indicates the selection
statement of nonavailability from local
status and source for the listed item.
procurement.
Source codes are:
Applied to major assemblies that are pro-
G
cred  with PEMA
(Procurment
Equipment Missile Army) funds for
Applied to repair parts which are stocked
P
initial issue only to be used as exchange
in or supplied from GSA/DSA Army
assemblies at DSU and GSU level or
supply system, and authorized for use
returned to depot supply level.
at indicated maintenance categories.
Applied to repair parts which are not pro-
M
Note. Source code is not shown on common hard-
cured or stocked but are to be manu-
ware items known to be readily available in Army sup-
factured at indicated maintenance cate-
ply channels and through local procurement.
gories.
(2) Maintenance code indicates the lowest
Applied to assemblies which are not pro-
A
category of maintenance authorized to
cured or stocked as such, but made up
of two or more units, each of which
install the listed item. The mainte-
carry individual stock numbers and
nance level code is:
descriptions and are procured and
stroked and can be assembled by units
at indicated maintenance categories.
55

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business