|
|
TM
5-6115-423-15
(6) If these readings are not obtained,
De-energize the load bank and con-
(4)
replace the control transformer.
nect voltmeter to terminals Xl and
X2.
b. Removal and Installation. Refer to figure
(5) Energize load bank and the voltmeter
23 to remove and install the step down trans-
should read between 24 and 30 volts
formers.
AC.
Figure 19. Rectifier removal and installation
34
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |