Click here to make tpub.com your Home Page

Page Title: Figure 6-5. Preparing outer edge of tank bottom
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5430-209-12
1.
BLOCKING
2.
STRIP GASKET
3.
WEDGE GASKET
4.
BOLT
5.
TANK BOTTOM
Figure 6-5. Preparing outer edge of tank bottom.
a. General. The first stave installed must be one
(2) Install strip gasket (2) to cover all boltholes.
When one roll of gasket is used up and another started,
fitted with a pipe coupling of the same size as the tank
the overlap should extend over two boltholes. Apply
supply pipe. Staves are installed in a counterclockwise
sealing compound at each overlap.
direction around the tank bottom.
b. First Stave.
(3) Insert wedge gasket (3) underneath strip
gasket (2) at seams formed by the bottom plates.
(1) Place first stave (1, fig. 6-6) over bolts (2)
(4) Insert bolts (4) through all boltholes in the
so that stave straddles a radial seam in tank bottom.
bottom and gasket (2).
As a result, each subsequent stave will straddle a radial
seam.
6-9. Installation of Side Staves
6-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business