|
|
TM 5-5430-209-12
(b) Along the right seam of each stave,
as it will be put in place with the chimes out, place strip
gasket (1, fig. 3-9) on the outside at the row of bolt
holes. The gasket material comes in rolls and is cut to
proper length for each stave. Cut the gasket material so
that it covers and projects one bolt hole past the top and
bottom chimes.
1. CHIMES BENT INWARD
2. CHIMES BENT OUTWARD
Figure 3-8. State chimes bent.
3-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |