- TECHNICAL MANUAL OPERATOR AND ORGANIZATIONAL MAINTENANCE MANUAL TANK,STEEL, VERTICAL, BOTED, KNOCKDOWN, SEALED OPENINGS, STANDARD BOTTOM AND ROOF, GASOLINE, OIL, OR WATER
- SAFETY PRECAUTIONS
- Distribution
- TECHNICAL MANUAL OPERATOR AND ORGANIZATIONAL MAINTENANCE MANUAL TANK,STEEL, VERTICAL, BOTED, KNOCKDOWN, SEALED OPENINGS, STANDARD BOTTOM AND ROOF, GASOLINE, OIL, OR WATER
- Figure 3-19. Center support ladder assembled.
- Figure 3-21. Deck plate components.
- Figure 4-9. Deck plate assembly.
- Distribution
- Table 3-1. Identification of Component Items, below line 58, "Washer, Sealing"
- Table 4-1. Identification of Component Items, under line 18, "Washer, Sealing"
- Table 7-1. Identification of Component Items, line 41, "Washer, Sealing"
- Distribution
- Table of Contents
- Table of Contents cont'd
- Table of Contents cont'd
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS cont'd
- LIST OF ILLUSTRATIONS cont'd
- CHAPTER 1 INTRODUCTION
- Figure 1-2. 500-barrel capacity steel tank.
- Figure 1-3. 1000-barrel capacity steel tank
- Figure 1-4. 3000-barrel capacity steel tank.
- Figure 1-5. 10,000-barrel capacity steel tank
- Tabulated Data
- Chapter 2 MAINTENANCE INSTRUCTIONS
- Figure 2-2. Checking grade of tank foundation
- Figure 2-3. Concrete foundation ring
- Figure 2-4. Typical firewall construction for fuel storage tanks
- Section III. INSPECTING AND SERVICING THE EQUIPMENT
- CHAPTER 3 ERECTION INSTRUCTIONS FOR THE 100-BARREL CAPACITY TANK
- Figure 3-1. Bottom plates.
- Assembly of Tank Bottom
- Figure 3-3. Bottom plates installed.
- Bolt Replacement Plug
- Figure 3-6. Testing sears and bolts in tank bottom for leaks
- Figure 3-7. Layout of staves around tank bottom.
- Figure 3-8. State chimes bent
- Figure 3-9. States with gasket, channel, and bolts assembled
- Figure 3-10. Raising and prearing outer edge of tank bottom
- Figure 3-11. Installing first stave
- Figure 3-12. Aligning staves
- Figure 3-14. Installing last stave
- Figure 3-15. Removing timber blocking
- Figure 3-16. Applying sealing compound to bottom chimes of slaves
- Figure 3-18. Dressed top chime of staves
- Section IV. ASSEMBLY AND INSTALLATION OF TANK DECK
- Figure 3-20. Deck plates ready for installation
- Assembly of Special Plates
- Figure 3-23. First deck plate installed
- Section V. ASSEMBLY AND INSTALLATION OF TANK ACCESSORIES
- Access Ladder
- Figure 3-27. Water drawoff valve installed on outside of tank
- Tank Outlet (4and 6-inch)
- Figure 3-29. Four-inch cap installed.
- Section VI. TANK TESTING AND FINAL ASSEMBLY
- Figure 3-31. Gaskets at cleanout opening installed (10,000 barrel capacity tank).
- Figure 3-32. Temporary partial cover for cleanout opening (10. 000-barrel capacity tanks)
- Cleanout Cover
- Table 3-1. IDENTIFICATION OF COMPONENT
- Table 3-1. IDENTIFICATION OF COMPONENT
- Table 3-1. IDENTIFICATION OF COMPONENT
- CHAPTER 4 ERECTION INSTRUCTIONS FOR THE 250-BARREL CAPACITY TANK
- Figure 4-2. Installation of bottom plates
- Figure 4-3. Installing wedge gaskets before installation of last bottom plate
- Figure 4-4. Checking bolt spacing at installation of last bottom plate.
- Figure 4-5. Adjusting installed bottom plates
- Section II. ASSEMBLY AND INSTALLATION OF SIDE STAVES
- Figure 4-7. Center support ladder assembled
- Installation of Ladder
- Section IV. ASSEMBLY AND INSTALLATION OF TANK DECK
- Figure 4-10. Installing last deck plate.
- Section VI. TANK TESTING AND FINAL ASSEMBLY
- TABLE 4-1. IDENTIFICATION OF COMPONENT ITEMS
- TABLE 4-1. IDENTIFICATION OF COMPONENT ITEMS
- CHAPTER 5 ERECTION INSTRUCTIONS FOR THE 500-BARREL CAPACITY TANK
- Figure 5-1. Layout of staves around tank bottom
- Section V. ASSEMBLY AND INSTALLATION OF TANK ACCESSORIES
- Section VII. IDENTIFICATION OF COMPONENT ITEMS
- Table 5-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 5-1. IDENTIFICATION OF COMPONENT ITEMS
- CHAPTER 6 ERECTION INSTRUCTIONS FOR THE 1000-BARREL CAPACITY TANK
- Figure 6-2. First bottom plate installed.
- Figure 6-3. Installation of bottom plates
- Section II. ASSEMBLY AND INSTALLATION OF SIDE STAVES
- Figure 6-5. Preparing outer edge of tank bottom
- Figure 6-6. Installing first stave
- Figure 6-7. Installing last stave
- Figure 6-8. Umbrella-type deck support assembled
- Figure 6-9. Umbrella-type deck support prior to installation
- Installation of Tank Center Support Assembly
- Figure 6-10. Tank center support assembly installed
- Section IV. ASSEMBLY AND INSTALLATION OF TANK DECK
- Figure 6-11. Deck rafter assembled
- Figure 6-12. Assembling special deck plate
- Figure 6-14. First deck plate installed
- Installation of Tank Deck cont'd
- Figure 6-15. Inner end of deck plates dressed.
- Figure 6-16. Deck center sections and manhole dome
- Figure 6-18. Manhole dome and cover installed
- Section V. ASSEMBLY AND INSTALLITION ACESSORIES
- Figure 6-19. Access ladder installed
- Figure 6-20. Emergency vent installed
- Manhole Air Intake
- Tank Outlets
- Section VII. IDENTIFICATION OF COMPONENT ITEMS
- Table 6-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 6-1. IDENTIFICATION OF COMPONENT ITEMS
- CHAPTER 7 ERECTION INSTRUCTIONS FOR THE 3000-BARREL CAPACITY TANK
- Figure 7-1. Second-ring staves dressed and ready for installation
- Section III. ASSEMBLY AND INSTALLATION OF TANK CENTER SUPPORT ASSEMBLY
- Figure 7-3. Tank center support installed
- Section IV. ASSEMBLY AND INSTALLATION OF TANK DECK
- Figure 7-4. Access ladder and guard installed
- Deck Guard
- Section VI. TANK TESTING AND FINAL ASSEMBLY
- Table 7-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 7-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 7-1. IDENTIFICATION OF COMPONENT ITEMS
- CHAPTER 8 ERECTION INSTRUCTIONS FOR THE 10,000-BARREL CAPACITY TANK
- Figure 8-3. Positioning the bolt retaining boards
- Figure 8-5. Installation
- Figure 8-6. Assembly of inner and outer bottom plates
- Figure 8-7. Assembling bottom Sections
- Figure 8-10. Stacking assembled bottom sections
- Figure 8-12. Installing first bottom section
- Figure 8-14. Installing first intermediate bottom section
- Installing Last Bottom Section
- Figure 8-19. Lifting and supporting outer edge of installed bottom sections
- Figure 8-20. Installing special gasket
- Section II. ASSEMBLY, AND INSTALLATION OF SIDE STAVES
- Figure 8-23. Assembling gaskets, channels, and bolts
- Installation of First Ring Side Staves
- Figure 8-28. Installing first intermediate stave
- Figure 8-29. Bracing first stave and driving bolt heads into channels.
- Scaffold
- Dressing the Top Chime cont'd
- Figure 8-33. Hoisting second stave of second ring
- Figure 8-34 Attaching guy line to hold second ring staves
- Figure 8-36. Hoisting last stave into position in second ring
- Section III. ASSEMBLY AND INSTALLATION OF TANK CENTER SUPPORT ASSEMBLY
- Figure 8-39. Assembly of umbrella-type deck support
- Figure 8-41. Erecting gin pole for Installation of middle center support
- Figure 8-43. Middle center support in final position
- Figure 8-45. Raising umbrella-type deck support.
- Figure 8-46. Umbrella-type deck support in place
- Section IV. ASSEMBLY AND INSTALLATION OF TANK DECK
- Figure 8-48. Trussed rafter.
- Figure 8-49. Assembled trussed rafter
- Figure 8-50. Rafter hanger installed.
- Figure 8-51. Adjusting height of center support
- Installing Second Deck Section
- Figure 8-54. Installing deck plates and fittings
- Figure 8-55. Completed assembly of deck sections.
- Section V. ASSEMBLY AND INSTALLATION OF TANK ACCESSORIES
- Figure 8-57. Ladder bottom section installed
- Figure 8-58. Middle and top ladder sections installed
- Section VI. TANK TESTING AND FINALLY ASSEMBLY
- Table 8-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 8-1. IDENTIFICATION OF COMPONENT ITEMS
- Table 8-1. IDENTIFICATION OF COMPONENT ITEMS
- CHAPTER 9 MOVEMENT OF TANKS TO A NEW WORKSITE
- Section II. TRANSPORTING TANK COMPONENTS
- CHAPTER 10 TANK REPAIR AND CALIBRATION
- Table 10-1. Material for Installation of Concrete Cap
- Figure 10-1. Installation of tie rods and reinforcement fabric
- Figure 10-2. Caulking groove boards and concrete cap installed
- Section III. TANK STRAPPING AND CALIBRATION
- Figure 10-4. Tank measuring technique
- Conversion Formulas
- Table 10-2. Recommended Strapping Tools and Components
- CHAPTER 11 DEMOLITION TO PREVENT ENEMY USE
- Figure 11-2. Placement of demolition charges (1000-, 3000-, and 10,000-barrel tanks)
- APPENDIX A REFERENCES
- INDEX
- INDEX cont'd
- INDEX cont'd
- Distribution
- Operator and Organizational Maintenance Manual
- SAFETY PRECAUTIONS
- Reporting of Errors
- Sealing Seams
- Sealing Seams
- Sealing Seams cont'd
- Recommended Changes to Equipment Technical Publications
- TM-5-5430-209-12
- Blank Page
|