2E + Bays
18
19
20
21
22
L/Nose
6N1+
6N1+
6N1+
6N1+
6N1+
3N2
3N2
3N2
3N2
3N2
1p2
1p2
1p2
1p2
Boom
1p2
7,6
7,6
7,6
7,6
7,6
Remove
3N2**
3N2**
3N2**
3N2**
3N2**
5,4
5,4
5,4
5,4
5,4
6N1*
6N1*
6N1*
6N1*
6N1*
3,2
3,2
3,2
3,2
3,2
(Bp3)
(Bp3)
(Bp3)
(Bp3)
(Bp3)
(CG)
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E)
1,E
Compl. By:
Note g
Note g
Note g
Note g
Note g
NOTES:
a. Remove curbs, ramps and deck units and add counterweight if
required.
b. Position ex. FRB under bridge min. 1.5 ft. (0.5 m) from end.
c. Add LNCG posts, LNCG, nose roller and install launching nose,
then reposition LRP 12 ft from A peg.
d. Delaunch bridge until far BSB is 6 ft. (1.8 m) from A peg or end of
ETP overhangs CRB by min. 1.5 ft (0.5 m).
e. Reposition LRP against A peg and then remove ex. FRB.
f. Stop boom/delaunch to remove long or short links, light tackle, anti-
flutter and add launching noses as
required, observing minimum 5ft. (1.5 m) overhang.
g. Disassemble FRB and RRB. Clear site.
** Remove double story launching nose.
* Remove remainder of launching nose, LNCG, LNCG posts and
nose roller.
( ) Center of gravity.