|
|
TABLE 2-31 Building and Boom Table-2E +18 through 2E
22 Bay Link Reinforced (Normal Site)
Bridge ft.
138
144
150
156
162
Length .
42.1
43.9
45.7
47.6
49.2
2E + Bays
18
19
20
21
22
L/Nose
6N1+
6N1+
6N1+
6N1+
6N1+
3N2
3N2
3N2
3N2
3N2
Counter-
[8D]
[20D+
[30D+
[40D+
weight
6C]
6C]
6C]
1p2
1p2
1p2
1p2
Build E + 1
1p2
Note a
Note a
Note a
Note a
with RRB at:
Note a
2,3
2,3
2,3
2,3
Add
2,3
6N1*
6N1*
6N1*
6N1*
6N1*
4,5
4,5
4,5
4,5
4,5
3N2**
3N2**
3N2**
3N2**
3N2**
6.7
6.7
6.7
6.7
6.7
(Ap2)
(Ap2)
(Ap2)
(Ap2)
(Ap2)
(CG)
Boom
2p7
2p7
2p7
2p7
2p7
Add
8,9,10
8,9,10
8,9,10
8,9,10
8,9,10
(CG)
2p3
2p3
2p3
2p3
2p3
Boom
4p5
4p5
4p5
4p5
4p5
Add
11,12,13
11,12,13
11,12,13
11,12,13
11,12,13
(CG
(4p0)
(4p0)
(4p0)
(4p0)
(4p0)
Boom
10p0
10p0
10p0
10p0
10p0
Add
AA(L)
AA(L)
AA(L)
AA(L)
AA(L)
Note b
Note b
Note b
Note b
Note b
(CG
(4p0)
(4p0
(4p0
(4p0
(4p0
11p0
11p0
11p0
11p0
11p0
Boom
AA(S)
AA(S)
AA(S)
AA(S)
Add
AA(S)
14 thru
14 thru
14 thru
14 thru
14 thru
17
17
17
17
17
6p0
6p0
6p0
(CG
6p0
6p0
2-64
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |