|
|
2E + Bays
10
11
12
L/Nose
6N1
7N1
7N1
8N1
7N1
8N1
Boom
2p0
2p0
2p0
2p0
2p0
2p0
Pin at
Pin at
Pin at
Pin at
Remove
Pin at
Pin at
A
A
A
A
A
A
Boom
1p4
1p4
1p4
1p4
1p4
1p4
TP4
TP4
TP4
TP4
Remove
TP4
TP4
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
E
E
E
E
E
E
Remove
Complete
Note
Note
Note
Note
Note
Note
by:
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN.
Re-position LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum
5 ft (1.5 m) overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-61
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |