|
|
2E + B
6
7
8
9
L/Nose
5N1
6N1
5N1
6N1
6N1
7N1
6N1
7N1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Rem
E
E
E
E
E
E
E
E
Comp
Note
Note
Note
Note
Note
Note
Note
Note
by
e
e
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Reposition
LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-58
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |