Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

2E + Bays
1
2
3
4
5
L/Nose
3N1
4N1
4N1
4N1
5N1
5N1
6N1
Boom
1p4
1p7
1p7
1p7
1p4
1p5
1p4
4N1*
4N1*
4N1*
5N1*
5N1*
6N1*
Remove
3N1*
(CG)
(Bp1)
(Ap1)
(Ap2)
(1p3)
(Ap2)
(1p3)
(1p3)
Boom
Dp2
2p0
2p0
2p0
2p0
2p0
2p0
Pin
Pin
Pin
Pin
Pin
Remove
Pin
Pin
at A
at A
at A
at A
at A
at A
at A
Boom
1p2
1p4
1p4
1p4
1p4
1p4
1p4
Remove
D
D
TP3
TP4
TP3
TP4
TP3
3
BP2
BP2
BP2
3
BP2
BP2
BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
TP2
TP2
TP2
TP2
Remove
1
TP2
TP2
1
1
1
1
1
1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
E
E
Complete
Note
Note
Note
Note
Note
Note
Note
by:
e
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under
bridge min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Re-Posi-
tion LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-55

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business