2E + Bays
1
2
3
4
5
L/Nose
3N1
4N1
4N1
4N1
5N1
5N1
6N1
Boom
1p4
1p7
1p7
1p7
1p4
1p5
1p4
4N1*
4N1*
4N1*
5N1*
5N1*
6N1*
Remove
3N1*
(CG)
(Bp1)
(Ap1)
(Ap2)
(1p3)
(Ap2)
(1p3)
(1p3)
Boom
Dp2
2p0
2p0
2p0
2p0
2p0
2p0
Pin
Pin
Pin
Pin
Pin
Remove
Pin
Pin
at A
at A
at A
at A
at A
at A
at A
Boom
1p2
1p4
1p4
1p4
1p4
1p4
1p4
Remove
D
D
TP3
TP4
TP3
TP4
TP3
3
BP2
BP2
BP2
3
BP2
BP2
BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
TP2
TP2
TP2
TP2
Remove
1
TP2
TP2
1
1
1
1
1
1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
E
E
Complete
Note
Note
Note
Note
Note
Note
Note
by:
e
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under
bridge min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Re-Posi-
tion LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.