2E + Bays
10
11
12
L/Nose
6N1
7N1
7N1
8N1
7N1
8N1
Boom
4p4
2p6
3p6
1p6
4p7
3p0
Remove
9
6
8
5
10
7
(CG)
(2p3)
(Bp0)
(1p4)
(Cp0)
(2p5)
(Ap2)
Boom
4p0
2p1
2p6
3p6
2p3
Remove
8
5
7,6
9,8
6
(CG)
(1p6)
(Bp5)
(Bp0)
(1p4)
(Bp3)
Boom
3p0
2p6
1p6
Remove
7,6
7,6
5
(CG)
(Ap2)
(Cp2)
(Cp0)
1p2
1p2
1p2
1p2
1p2
Boom
1p2
4
5,4
8N1,4
5,4
8N1,4
Remove
(Cp2)
(Cp2)
(Cp2)
(Cp2)
(Cp2)
(CG)
7N1*
7N1*
7N1*
7N1*
7N1*
Remove
6N1*
3,2
3,2
3,2
3,2
3,2
3,2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
1,E
Complete
Note
Note
Note
Note
Note
Note
by:
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Reposition
LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-53
|