|
|
2E + Bays
7
8
9
L/Nose
5N1
6N1
6N1
7N1
6N1
7N1
Boom
3p2
2p4
3p4
Remove
6
5
7
(CG)
(1p0)
(Bp2)
(1p2)
Boom
2p2
1p7
3p0
Remove
5,4
4
6
(CG)
(Bp4)
(Bp7)
(Ap2)
Boom
1p7
Remove
5,4
(CG)
(Bp7)
Boom
1p2
1p2
1p2
1p2
1p2
1p2
Remove
5N1*
6N1*
6N1*
4
6N1*
4
3,2
3,2
3,2
7N1*
3,2
7N1*
3,2
3,2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
1,E
Complete
Note
Note
Note
Note
Note
Note
by:
e
e
e
e
e
e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Reposition
LRP [base 9in (23cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-51
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |