2E + Bays
18
19
20
21
22
L/Nose
6N1
7N1
7N1
7N1
8N1
1p7
1p7
1p7
1p7
Boom
1p7
TP7
TP7
TP7
TP7
Remove
TP7 thru
Bp6
Bp6
BP6
BP5
BP6
3N2**
3N2**
3N2**
8N1**
3N2**
TP6 thru
TP6 thru
TP6 thru
TP6 thru
BP4
BP4
BP4
BP4
BP4
7N1*
6N1*
6N1*
6N1*
6N1*
(1p3)
(1p3)
(1p3)
(1p3)
(1p3)
(CG)
Boom
2p0
2p0
2p0
2p0
2p0
Remove
PIN at A
PIN at A
PIN at A
PIN at A
PIN at A
Boom
1p4
1p4
1p4
1p4
1p4
Remove
TP4 thru
TP4 thru
TP4 thru
TP4 thru
TP4 thru
BP2
BP2
BP2
BP2
BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
TP2, 1
TP2, 1
TP2, 1
TP2, 1
TP2, 1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
Complete
Note d
Note d
Note d
Note d
Note d
by:
NOTES:
a.
Remove all curbs, ramps, and deck units and add counterweight
if reqiured.
b.
Position CRB under bridge min. 1.5 ft (0.5 m) from end.
c.
Add LNCG posts, LNCG and nose roller and install launching
nose, observing minimum 5 ft (1.5 m) overhang.
d.
Disassemble FRB and RRB. Clear site.
Remove 8th LNH (after BP5)or all of 3N2 (after BP6).
**
Remove given length of launching nose, LNCG, LNCG posts and
nose roller.
[]
Counterweight
()
Center of gravity.