|
|
2E + Bays
1
2
3
4
5
6
L/Nose
2N1
3N1
3N1
3N1
4N1
4N1
Boom
2p0
2p0
2p0
Remove
Pin
Pin
Pin
at A
at A
at A
Boom
1p4
1p4
1p4
1p4
Remove
TP3
TP4
TP4
TP4
BP2
3, BP2
3, BP2
3, BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
1
TP2, 1
TP2, 1
TP2, 1
TP2, 1
TP2, 1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
E
Complete
Note f
Note f
Note f
Note f
Note f
Note f
by:
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB. Add LNCG
posts, LNCG and nose roller.
c.
For 2E + 1 only. Add 2 LNH and LLN.
d.
For 2E + 2 through 2E + 12, add 3 LHN. Reposition LRP [base 9in
(23cm) from BSB].
e.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
f.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-39
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |