|
|
2E +
18
19
20
21
22
Bays
L/Nose
8N1
6N1+
6N1+
6N1+
6N1+
3N2
3N2
3N2
3N2
Boom
3p0
2p4
2p4
2p4
2p4
Remove
9 thru 7
9 thru 7
9 thru 7
9 thru 7
9 thru 7
(CG)
(Ap2)
(Bp2)
(Bp2)
(Bp2)
(Bp2)
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
Complete
Note d
Note d
Note d
Note d
Note d
by:
NOTES:
a.
Remove all curbs, ramps, and deck units and add counterweight if
required.
b.
Position CRB under bridge min. 1.5 ft (0.5 m) from end.
c.
Add LNCG posts, LNCG and nose roller and install launching
nose, observing minimum 5 ft (1.5 m) overhang.
d.
Disassemble FRB and RRB. Clear site.
Remove 8th LNH or all of 3N2 (double-story nose).
**
*
Remove given length of launching nose, LNCG, LNCG posts and nose
roller.
[]
Counterweight.
()
Center of gravity.
2-37
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |