2E + Bays
13
14
15
16
17
L/Nose
6N1
7N1
7N1
7N1
8N1
Boom
1p2
1p2
1p2
1p2
1p2
Remove
5
6,5
6,5
6,5
6,8N1**
6N1*,4
7N1*,4
7N1*,4
7N1*,4
7N1*,4
3,2
3,2
3,2
3,2
3,2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
Complete
Note d
Note d
Note d
Note d
Note d
by:
NOTES:
a.
Remove all curbs, ramps, and deck units.
b.
Position CRB under bridge min. 1.5 ft (0.5 m) from end.
c.
Add LNCG posts, LNCG and nose roller and install launching
nose, observing minimum 5 ft (1.5 m) overhang.
d.
Disassemble FRB and RRB. Clear site.
th
**
Remove 8 LNH or all of 3N2 (double-story nose).
*
Remove given length of launching nose, LNCG, LNCG posts and
nose roller.
()
Center of gravity.
2-35
|