2E + Bays
7
8
9
10
11
12
L/Nose
4N1
5N1
5N1
5N1
6N1
6N1
1p2
1p2
1p2
1p2
1p2
Boom
1p2
5,4
5,4
5,4
5,4
5,4
Remove
4
(Bp7)
(Bp5)
(Bp7)
(Bp5)
(CG)
(Bp2)
(Bp5)
6N1*
6N1*
5N1*
5N1*
5N1*
Remove
4N1*
3,2
3,2
3,2
3,2
3,2
3,2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
1,E
Complete
Note f
Note f
Note f
Note f
Note f
Note f
by:
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge
min. 1.5 ft (0.5 m) from end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB. Add LNCG
posts, LNCG and nose roller.
c.
For 2E + 1 only. Add 2 LNH and LLN.
d.
For 2E + 2 through 2E + 12, add 3 LNH. Reposition LRP [base
9in
(23 cm) from BSB].
e.
Add remaining nose sections, observing minimum 5 ft (1.5 m)
overhang.
f.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose
roller.
()
Center of gravity.
2-33
|