2E +Bays
10
11
12
L/Nose
6N1
7N1
7N1
8N1
7N1
8N1
Launch
8p4
5p4
7p4
4p4
9p4
6p4
Remove
RRB
RRB
RRB
RRB
RRB
RRB
Launch
10p4
7p4
9p4
6p4
11p4
8p4
Add
E
8
10
7
12
9
Launch
8p4
10p4
7p4
12p4
9p4
Add
9
11
8
E
10
Launch
9p4
11p4
8p4
10p4
Add
10
E
9
11
Launch
10p4
9p4
11p4
Add
E
10
12
Launch
10p4
12p4
Add
11
E
Launch
11p4
Add
E
Complete
Note
Note
Note
Note
Note
Note
By
c,d
c,d
c,d
c,d
c,d
c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as
they pass LRP, observing minimum 5 ft (1.5m) overhang. Leave
last three nose sections in place until far bank end of bridge has
been lowered to ground.
c.
Launch until far bank end of bridge is 9 in (23cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft (0.5m).
d.
Put bridge on ground.
Add entire launching nose with LRP secured with tie down strap.
Nose completed by adding 8th LNH.
**
()
Center of gravity.
2-29
|