|
|
2E +Bays
7
8
9
L/Nose
5N1
6N1
6N1
7N1
6N1
7N1
Launch
5p4
2p4
4p4
2p4
6p4
3p4
Remove
RRB
RRB
RRB
RRB
RRB
RRB
Launch
7p4
4p4
6p4
4p4
8p4
5p4
Add
E
5
7
5
9
6
Launch
5p4
7p4
5p4
9p4
6p4
Add
6
8
6
E
7
Launch
6p4
8p4
6p4
7p4
Add
7
E
7
9
Launch
7p4
7p4
8p4
Add
E
8
9
Launch
8p4
9p4
Add
E
E
Complete
Note
Note
Note
Note
Note
Note
By
c,d
c,d
c,d
c,d
c,d
c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as
they pass LRP, observing minimum 5 ft (1.5m) overhang. Leave
last three nose sections in place until far bank end of bridge has
been lowered to ground.
c.
Launch until far bank end of bridge is 9 in (23cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft (0.5m).
d.
Put bridge on ground.
*
Add entire launching nose with LRP secured with tie down strap.
()
Center of gravity.
2-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |